London, UK

1 Leadenhall Street

The KIPO team were asked to commission Discrimination Study and MV design verification. The objective was to provide a completed report giving its findings for the protection and discrimination for all the LV distribution. A report also considered the downstream main distribution and protective device settings to establish coordinated grading.

Our services and solutions:

  • The discrimination study, using the breaker manufacturers’ proposed software Amtech

  • Consultation directly with breaker manufacturers in relation to this new discrimination study in terms of implementation

  • Review of the generator equipment to adopt the new settings

  • Provision of a list of settings.

  • A survey to establish the protection devices

  • Short circuit and earth fault study

  • A full report with time current curves and settings

PROJECT DETAILS:

Client: Engineering company

Sector: Power Systems Studies/ Commercial