Milton Keynes, UK
Cadent Gas
KIPO were appointed by CBRE to provide a detailed visual survey of the Cadent Gas Power station’s MEP services, as well as detailed design of their HV and earthing systems.
Our services and solutions:
Undertook a detailed visual survey of MEP services
Worked closely with the client to identify budget costs and a programme of works for each project item
Provided detailed documents and tender information for RIBA stage 4a deliverables
Provided technical support for the duration of the project
HV (11Kv) supply and distribution
Lighting and Emergency Lighting, earthing and bonding, containment system
Switchgear specification
Short Circuit Study in accordance with BS EN 60909: 2016, using ERAC’s software
Earthing and potential rise calculations in accordance with BS7430
Earth fault and Overcurrent grading study and safety settings, using ERAC software
Review as to whether inrush protection is needed
PROJECT DETAILS
Client: CBRE
Sector: Power Stations