City of Westminster College
We were appointed by McLaren Construction Group to perform a review of a non-operational CHP system in order to propose a solution to allow the property to regain use of the scheme.
Our services and solutions included:
Came to an agreement with the utility provider to export power to the grid, thereby ensuring the CHP system would continue to function without tripping
Modified the design of the 400KVA CHP system with additional BMS controls added to ensure heat rejection was minimised
PROJECT DETAILS
Client: City of Westminster College
Sector: Education
Main Contractor: McLaren Construction Group
London, UK
City of Westminster College
We were appointed by McLaren Construction Group to perform a review of a non-operational CHP system in order to propose a solution to allow the property to regain use of the scheme. Our solution was come to an agreement with the utility provider to export power to the grid, thereby ensuring the CHP system would continue to function without tripping. In addition, KIPO modified the design of the 400KVA CHP system with additional BMS controls added to ensure heat rejection was minimised.
PROJECT DESCRIPTION
Client: City of Westminster College
Main Contractor: McLaren Construction Group
Project: City of Westminster College
Value: £200,000
Sector: Education
Location: London, England