Draper’s Gardens
KIPO were appointed by Blackrock to carry out a protection and discrimination study for a bank at Draper’s Gardens. We were also employed to provide a power generation and UPS design with 2.5MW generators and transformers.
Our services and solutions included:
Detailed Design of 2 x 2MWe generators, 4 x 2500kVA transformers and 2 x 1MW UPS systems
Survey of existing breakers and settings taken from the building to establish grading status
Red, Yellow and Green flag status to the findings of a report
Corrective actions register including risk review, suitability of breaker/ trip unit selection and causes of action proposed
PROJECT DETAILS
Client: Blackrock
Sector: Offices