Projects

London, UK

Holborn Citadines Hotel

KIPO were appointed to replace two existing boilers located in a rooftop plantroom above 6 floors of serviced apartments.

Our Services and Solutions:

  • Replacement of existing boilers with Air Source Heat Pumps to reduce the peak heating load on the boilers and the hotel’s dependence on fossil fuel consumption

PROJECT DETAILS

Client: The Ascott Limited

Sector: Hospitality