London, UK

KPMG HQ

KIPO were appointed by CBRE to reinstate a necessary function for the generator to back up the power source, and to enable safe operation in an emergency and during the loss of utility power to the KPMG building in Canary Wharf. KIPO undertook an urgent, new and simplified generator controls design to suit the requirements of the client; and also appointed and oversaw specialist controls contractor works on behalf of the client.

Our services and solutions included:

  • Decommissioned CHP and its controls

  • Transient stability calculations

  • Provided client with a de-risking plan

  • Selectivity Study for Overcurrent

  • Earth fault settings

PROJECT DETAILS:

Client: CBRE

Sector: Offices